Yesterday's delivery of the gravel for the driveway marked it's near completion. I was on a conference call so I couldn't watch the delivery or most of the spreading it around but suffice it to say, it's done! And I'm glad!
|
The carport is now higher than the ground! |
|
The dirt was reformed to be a berm along the ditch
and a nearly 2ft berm behind the tree there in the center |
|
You can see the crest over the pipe to keep water
off the driveway slope |
Later, when the side access driveways are installed, the gravel will be scraped up and reapplied as base for the new driveways. A side effect of this much needed drainage improvement is the newly relocated dirt in the form of berms along the ditches. There's a lot of new bare ground surface that needs to be tilled and seeded. It's always something.
In the meantime, it's back to inside work.