Sooooo..... I stayed focused on the house....or tried to!
Friday evening started with applying drywall in the bathrooms. While I focused primarily on the Master Bath first, I alternated back and forth between the two bathrooms depending on the size of drywall needed. I had a bunch of scrape/left over pieces that I wanted to use up before running to the big box store for more.
In the Master Bath, I started working from one end to the other, the entry doorway to the new shower stall.
Sink Wall |
After a lot of thought, I decided to skip it since I already had an alcove in the forward divider wall and simply paneled over it.
Only the last piece of hardibacker board needs to be cut and installed on the shower's outside divider wall.
Towards the entry door |
No comments:
Post a Comment